TY - GEN
T1 - Parallel architectures with regular structure
T2 - 5th International Workshop on Petri Nets and Performance Models, PNPM 1993
AU - Anglano, C.
AU - Donatelli, S.
AU - Gaeta, R.
N1 - Publisher Copyright:
© 1993 IEEE.
PY - 1993
Y1 - 1993
N2 - It is shown how to study the latency of packets exchanged by MIMD distributed memory architectures with regular structures. To reach this goal, the single node, the architecture topology, the routing algorithm, and the flow control algorithm are modeled. Models have been built with the formalism of stochastic well-formed coloured Petri nets (SWNs) having in mind modularity. Different types of nodes, topology, routing, and flow control are modeled in isolation and are then intermixed to study different architectures. To achieved simplicity and modularity, SWNs are used to their full power, so that this work constitutes quite a complete example of modeling with SWNs.
AB - It is shown how to study the latency of packets exchanged by MIMD distributed memory architectures with regular structures. To reach this goal, the single node, the architecture topology, the routing algorithm, and the flow control algorithm are modeled. Models have been built with the formalism of stochastic well-formed coloured Petri nets (SWNs) having in mind modularity. Different types of nodes, topology, routing, and flow control are modeled in isolation and are then intermixed to study different architectures. To achieved simplicity and modularity, SWNs are used to their full power, so that this work constitutes quite a complete example of modeling with SWNs.
UR - http://www.scopus.com/inward/record.url?scp=85064742809&partnerID=8YFLogxK
U2 - 10.1109/PNPM.1993.393448
DO - 10.1109/PNPM.1993.393448
M3 - Conference contribution
AN - SCOPUS:85064742809
T3 - Proceedings of 5th International Workshop on Petri Nets and Performance Models, PNPM 1993
SP - 226
EP - 235
BT - Proceedings of 5th International Workshop on Petri Nets and Performance Models, PNPM 1993
PB - Institute of Electrical and Electronics Engineers Inc.
Y2 - 19 October 1993 through 22 October 1993
ER -